Siemens Vectron ÖBB

On 05.03.2018 locomotive 1293 001 was the center of attention of a press event in Vienna. The event shows us the end result of a long tender procedure, that was launched back in October 2015 – it took the Austrian federal railways (ÖBB) more than 15 months to select a winner as the company decided to change its fleet strategy during the bidding process.

First there was room for manufacturers to come with innovative more experimental solutions – 6-axle or even 8-axle double locomotives were an option. But these plans were replaced by a safer option, and a much faster one: select a standardised product – tested and certified.

Siemens won, and so the ÖBB got Vectron electric locomotives. ‘91 81 1293 001-4 A-ÖBB‘ was the first to arrive – a standard 6.4 MW Vectron multi system locomotive with a top speed of 160 km/u and the new country specific package ‘AT-DE-IT-HU-CZ-PL-SK-HR-SI’.

The first batch of new locomotives was purchased for use by ÖBB’s freight divisions (Rail Cargo Group), replacing 1116 and 1216 being used on international freight routes.

All news and articles: