Over the past year, the first-built Dragon locomotive has been ‘under construction’ again. Polish manufacturer Newag took the machine in after it was decided to subject the locomotive to a ‘standardization process’. The goal was to replace/adjust as many parts possible so the 001 became similar to the later built series locomotives (E6ACT 002-009).
Data pages – latest updates:
- [Data] Bombardier TRAXX DC3 GTS Rail 22.01.2021
- [Data] Siemens Smartron BBL Logistik 22.01.2021
- [Data] All modern electrics with Polish NVR registrations 21.01.2021
- Locomotive Data Encyclopedia 21.01.2021
- [Data] Bombardier TRAXX DC3 21.01.2021